NEW QUESTION # 18
You are using DMO of SUM. You defined 40 parallel R3load processes during uptime and 80 parallel R3load processes during downtime. You have chosen table count verification, but not table contents comparison.
Phase EU_CLONE MIG_DT_RUN is running In the Charts Control Center, you can see 400 process buckets being executed in parallel.
Why are 40 Process Buckets executed in parallel?
- A. These are 40 pairs of R3load processes, so there are 80 R3load processes running
- B. SUM is still running in uptime; the 40 defined R3load processes are considered.
- C. Without table contents comparison, only 40 R3load processes are being started.
- D. There are 40 R3load processes used for copying and 40 R3load processes for table count verification.
Answer: A
NEW QUESTION # 19
You are planning an SAP S/4HANA conversion.
Which conversion-specific tasks must be performed during the preparation phase?
- A. Run the database migration to the SAP HANA database.
- B. Check the compatibility of custom code with SAP S/4HANA.
- C. Perform the migration of data to the new data structure.
- D. Solve problems from the simplification item (SI) checks.
Answer: B
NEW QUESTION # 20
During a SUM run, you want to check if the PARCONV_UPG phase is still running property. Where can you find information about this? Note: There are 2 correct answers to this question.
- A. Check for running R3load processes on the host where SUM is running
- B. Check the latest log files in the SUM directory, subdirectory a bap, subdirectory tmp.
- C. Check the running batch job via Job Overview (SM37).
- D. Check for running R3trans processes on the host where SUM is running
Answer: B,C
NEW QUESTION # 21
You are running an SAP ECC system .
For which of the following activities does SUM allow you to use the near-Zero Downtime Maintenance (nZDM) capabilities? Note: There are 3 correct answers to this question.
- A. Perform an SAP S/4HANA conversion without DMO.
- B. Use DMO for SUM.
- C. Perform an SAP S/4HANA conversion including DMO.
- D. Apply SAP Support Packages.
- E. Upgrade the SAP system.
Answer: B,D,E
NEW QUESTION # 22
You performed a custom code check for an SAP S/4HANA conversion.
In which transactions can you review the results? Note: There are 2 correct answers to this question.
- A. SAT(Runtime Analysis)
- B. SE80 (Object Navigator)
- C. ATC (ABAP Test Cockpit)
- D. SYCM (Simplification Database Content)
Answer: B,C
NEW QUESTION # 23
Which of the following are valid options to check the progress of an in place SUM DMO run? Note:
There are 2 correct answers to this question.
- A. Check logs for jobs starting with RSUPG SGEN in the SAP system.
- B. Check the dump size of the database export in the SUM directory, subdirectory a bap, subdirectory load.
- C. Check the log files written in the SUM directory, subdirectory a bap, subdirectory log
- D. Check the Charts Control Center in the SUM UL
Answer: C,D
NEW QUESTION # 24
You are performing an SAP S/4HANA conversion with DMO. You entered a specific number of R3load processes during the Extraction Roadmap step.
Where can you change this during the migration via the Utilities option of the SUM UI?? Note: There are 2 correct answers to this question.
- A. In Process Control Center
- B. In SUM Parameters
- C. In SUM Analysis
- D. In DMO Migration Preparation
Answer: A,B
NEW QUESTION # 25
Which step can be optimized when you provide the MIGRATE_DT_DURXML file to SUMM?
- A. Downtime conversion
- B. Shadow on target creation
- C. Downtime migration
- D. Silent data migration (SDM)
Answer: C
NEW QUESTION # 26
Which of the following scenarios does Software Update Manager cover? Note: There are 2 correct answers to this question
- A. New Implementation
- B. Conversion to SAP S/4HANAA on-premise
- C. Conversion to SAP S/4HANAA Cloud Public Edition
- D. Conversion to SAP S/4HANAA Cloud Private Edition
Answer: B
NEW QUESTION # 27
You are performing an SAP S/4HANA conversion with scenario strategy Standard. Which phases are executed during SUM technical downtime? Note: There are 2 correct answers to this question.
- A. PARDIST_SHD
- B. TABIM UPG
- C. TABIM_SHADOW_INC
- D. PARMVNT_UPG
Answer: B,D
NEW QUESTION # 28
Which of the following SUM activities require a stack XML file calculated by the maintenance planner? Note: There are 3 correct answers to this question.
- A. DMO without system update
- B. SAP S/4HANA conversion without DMO
- C. Benchmark tool
- D. SAP S/4HANA conversion including DMO
- E. Prerequisite check
Answer: B,D,E
NEW QUESTION # 29
What is the benefit of using the UPGANAXML file from a previous SUM run?
- A. To auto-fill specific fields on selected screens on the SUM UI
- B. To skip selected phases during the SUM run
- C. To make the progress information within SUM UI more accurate
- D. To repeat specific phases during the SUM run
Answer: C
NEW QUESTION # 30
Which steps should be performed during the adjustment of dictionary objects (SPDD) in the development system before SUM continues? Note: There are 2 correct answers to this question.
- A. Assign the transport request as a modification adjustment transport.
- B. Create new versions of the objects you need to adjust.
- C. Release the transport request containing the modification adjustment.
- D. Manually activate the adjusted dictionary objects.
Answer: A,B
NEW QUESTION # 31
SUM was registered at the SAP Host Agent.
Where does the SAP Host Agent find the path to the SUM directory?
- A. The path was stored to the environment of user <sid>adm during registration.
- B. The path is taken from the URL entered in the browser to start SUM.
- C. The path was stored in file host profile during registration.
- D. The path was stored in file sumabap.conf during registration.
Answer: D
NEW QUESTION # 32
You want to use the Custom Code Migration Work list via remote code analysis using the ABAP Test Cockpit (ATC). How can you get the latest content of the simplification database?
- A. Generate it by analyzing the specific custom code via RFC.
- B. Download it from the SAP Support Portal.
- C. Apply the corresponding SAAP Note via the Note Assistant.
- D. Configure it within transaction ATC.
Answer: B
NEW QUESTION # 33
You are performing an SAP S/4HANA conversion with the migration repetition option. After which phase does SUM stop to enable a test cycle?
- A. EU_CLONE MIG SOT RUN
- B. EU_CLONE MIG_DT_CREATTE
- C. EU IMPORT ALL
- D. EU CLONE MIG_DT_RUN
Answer: D