100% PASS RATE BICSI Other Certification IN101_V7 Certified Exam DUMP with 115 Questions [Q44-Q63]

Share

100% PASS RATE BICSI Other Certification IN101_V7 Certified Exam DUMP with 115 Questions

Updates For the Latest IN101_V7 Free Exam Study Guide!

NEW QUESTION # 44
Which of the following is a floor serving space that serves as a point of termination for horizontal and backbone cables?

  • A. ER
  • B. EF
  • C. TR
  • D. Work area

Answer: C


NEW QUESTION # 45
Which of the Two organizations jointly oversee the worldwide standardization of telecommunications cabling?

  • A. National Electrical Contractors Association (NECA) and National Fire Protection Association (NFPA)
  • B. Alliance for Telecommunications Industry Solutions (ATIS) and Society for Cable Telecommunications Engineers (SCTE)
  • C. International Organization for Standardization (ISO) and International Electrotechnical Commission (IEC)
  • D. Comite Europeen de Normalisation Electrotechnique (CENELEC) and Electronic Industries Association (EIA)

Answer: C


NEW QUESTION # 46
What is the maximum number of work areas that a CP should serve?

  • A. 0
  • B. 1
  • C. 2
  • D. 3

Answer: D


NEW QUESTION # 47
Which of the following is a property of an electromagnetic field built around a conductor that opposes any changes in current flow in a circuit?

  • A. Resistance
  • B. Capacitance
  • C. Impedance
  • D. Inductance

Answer: D


NEW QUESTION # 48
Which of the following terms describes the unwanted signal coupling from a disturbing pair of a 4-pair cable channel to a disturbed pair of another 4-pair channel?

  • A. ACRF - attenuation to crosstalk ratio far end
  • B. AXT - alien crosstalk
  • C. NEXT - Near end crosstalk

Answer: B


NEW QUESTION # 49
If the situation requires, a conduit should be terminated _______ the plywood backboard?

  • A. Below
  • B. Above
  • C. Through

Answer: C


NEW QUESTION # 50
How much sheath of the cable needs to be removed in order to properly terminate an 8P8C?

  • A. 25mm (1")
  • B. 38 mm (1.5")
  • C. 12.7mm (0.5")
  • D. 6.3mm (0.25")

Answer: C


NEW QUESTION # 51
What grade of plywood is recommended for use with ICT systems?

  • A. A/D
  • B. C/D
  • C. B/C
  • D. A/C

Answer: D


NEW QUESTION # 52
What is the markings for non-conductive optical fiber riser cable?

  • A. OFNG
  • B. OFNR
  • C. OFNP
  • D. OFCR

Answer: B


NEW QUESTION # 53
Which of the following describes a nonmechanical firestop system that forms a hard char when exposed to flame?

  • A. Intumescent
  • B. Ablative
  • C. Endothermic
  • D. Elastomeric

Answer: B


NEW QUESTION # 54
A third 90-degree bend may be permitted in a conduit run if one of the bends is located within ____ of the cable feed end?

  • A. 483mm (19")
  • B. 375 mm (15")
  • C. 300 mm (12")
  • D. 450 mm (18")

Answer: C


NEW QUESTION # 55
Light pulses in optical fiber cables are subjected to a loss in power as the light pulses travel along the optical fiber. Which of the following terms is used to describe this phenomenon?

  • A. Attenuation
  • B. Grounding
  • C. Crosstalk
  • D. Frequency

Answer: A


NEW QUESTION # 56
Which type of tester includes a set of modular plugs?

  • A. Tone generator
  • B. Inductive amplifier
  • C. Cable-end locator kit
  • D. Multimeter

Answer: C


NEW QUESTION # 57
Which of the following are typically used to support cables between a cable tray and work area outlets?

  • A. Pipe hanger
  • B. Trapeze
  • C. Innerduct
  • D. J-Hook

Answer: D


NEW QUESTION # 58
Which of the following types of cable produces very little smoke when burned?

  • A. CMUC
  • B. LSZH
  • C. CM
  • D. CMG

Answer: B


NEW QUESTION # 59
During the troubleshooting phase, what is the first step?

  • A. Verify
  • B. Repair
  • C. Isolate
  • D. Test

Answer: A


NEW QUESTION # 60
Which of the following tend to cause sheath damage during cable pulling?

  • A. FMC/FMT
  • B. RMC/IMC
  • C. EMT/ENT

Answer: A


NEW QUESTION # 61
Which of the following PPE items MUST be worn at all times when you are working with or handling OF?

  • A. Eye Protection
  • B. Hearing Protection
  • C. Breathing Protection
  • D. Fall Protection

Answer: A


NEW QUESTION # 62
What is the primary purpose of an electrical grounding system?

  • A. Ensure a minimal level of acceptable performance for a building's telecommunications infrastructure
  • B. Protect and provide organization for cables, splices and connectors
  • C. Prevent unauthorized access to the buildings electrical protection system
  • D. Enhance personnel safety and reduce the likelihood of a fire hazard

Answer: D


NEW QUESTION # 63
......


BICSI IN101_V7 exam is based on the BICSI Installer 1 training course, which covers the basic principles of cabling infrastructure installation. IN101_V7 exam covers a wide range of topics, including the installation of copper and fiber optic cables, the use of tools and equipment, safety procedures, and industry standards and codes.

 

Best IN101_V7 Exam Preparation Material with New Dumps Questions https://braindumps2go.dumpstorrent.com/IN101_V7-exam-prep.html