[Oct 22, 2022] Fully Updated Free Actual SAP C-S4EWM-1909 Exam Questions [Q13-Q32]

Share

[Oct 22, 2022] Fully Updated Free Actual SAP C-S4EWM-1909 Exam Questions

Free C-S4EWM-1909 Questions for SAP C-S4EWM-1909 Exam [Oct-2022]

NEW QUESTION 13
Bin sort sequences are assigned to a combination of the following fields. There are 3 correct answers to this question.

  • A. Stack
  • B. Warehouse number
  • C. Activity
  • D. Level
  • E. Storage type
  • F. Activity area

Answer: B,C,F

 

NEW QUESTION 14
In what EWM document is the warehouse process type assigned? Choose the correct answer(s).

  • A. Outbound delivery order
  • B. Outbound delivery request
  • C. Warehouse order
  • D. Outbound delivery

Answer: A

 

NEW QUESTION 15
In Heuristics for the Travel Distance Calculation, how system calculate Depth-first search? Please choose the correct answer.

  • A. The system attempts to find a route between the specified nodes of a network in the shortest time possible. Here, the search runs in the direction of start node to end node. The search finishes when the first complete route is found.
  • B. The system attempts to find a route between the specified nodes of a network in the average time possible. Here, the search runs in the direction of start node to end node. The search finishes when the last complete route is found.
  • C. The system attempts to find a route between the specified nodes of a network in the longest time possible. Here, the search runs in the direction of start node to end node. The search finishes when the first complete route is found.
  • D. The system attempts to find a route between the specified nodes of a network in the average time possible. Here, the search runs in the direction of start node to end node. The search finishes when the first complete route is found.

Answer: A

 

NEW QUESTION 16
What organizational unit is used to represent parking spaces, checkpoints and doors? Choose the correct answer.

  • A. Storage section
  • B. Storage bin
  • C. Material staging area
  • D. Storage type

Answer: B

 

NEW QUESTION 17
Which document is created in SAP Extended Warehouse Management when you use advanced production integration?

  • A. Outbound delivery request
  • B. Production order
  • C. Outbound delivery
  • D. Production material request

Answer: D

 

NEW QUESTION 18
Which methods do you use to transfer transactional data between SAP ERP and EWM? There are 2 correct answers to this question.

  • A. IPPE
  • B. BAPI
  • C. qRFC
  • D. IDOC

Answer: C,D

 

NEW QUESTION 19
Your customer wants to implement the material flow system [MFS] to control conveyers and the automated high rack storage area . How do you connect SAP Extended Warehouse Management to communicate with the programmable logic controllers [PLC] ?

  • A. Send an IDoc through a Post Processing Framework action to the PLC
  • B. Use an RFC adapter to connect with the TCP/IP socket server of the PLC
  • C. Activate the link to the subsystems using the ALE interface on the warehouse number
  • D. Directly integrate to the PLC using ABAP Push channels

Answer: B,C

 

NEW QUESTION 20
Which methods do you use to transfer transactional data between SAP ERP and SAP Extended Warehouse Management? Note : There are 2 correct answers to this question.

  • A. IPPE
  • B. BAPI
  • C. IDoc
  • D. qRFC

Answer: C,D

 

NEW QUESTION 21
What are the three kitting processes available in EWM? There are 3 correct answers to this question.

  • A. Kit-to-order
  • B. Kit de-stocking
  • C. Reverse kitting
  • D. Kit rebuild
  • E. Kit-to-stock

Answer: A,C,E

 

NEW QUESTION 22
The collaboration with appointment planners for carriers is based on which of the following? There are 3 correct answers to this question.

  • A. An assignment of the appointment planner for carrier to a specific carrier
  • B. A user with complete authorization
  • C. A business partner that represents an appointment planner for a carrier
  • D. A user with restricted authorization

Answer: A,C,D

 

NEW QUESTION 23
Which limit values can you use to restrict the size of the warehouse orders? There are 2 correct answers to this question.

  • A. Resources
  • B. Products
  • C. Processing time
  • D. Items

Answer: C,D

 

NEW QUESTION 24
When creating new document types , what must you keep in mind about system profiles?

  • A. That you should use the profiles created be Business Configuration Sets [BC Sets]
  • B. That you have to define your own profiles for your specific processes
  • C. That the profiles have to be assigned to your new document type
  • D. That the profiles are predefined and not changeable

Answer: D

 

NEW QUESTION 25
Which of the following is a prerequisite for assigning a warehouse order to a rescue automatically ?

  • A. The warehouse order must be picked from the same activity area that is assigned to the resource
  • B. The resource group of the resource must be assigned to the warehouse order creation rule
  • C. The creation of a pick handling unit must be done automatically with a packaging specification
  • D. The warehouse order must be in a queue that is assigned to the rescue either directly or through a resource group

Answer: D

 

NEW QUESTION 26
System can perform staging area and door determination in the background, you must define determination rules (outbound delivery process). When doing this, you first specify which values the system is to compare with the values in the delivery.
Which values can be used for the determination of outbound delivery process?
There are 3 correct answers to this question.

  • A. Warehouse process type
  • B. Routes
  • C. Yard
  • D. Staging area / door determination group
  • E. Departure calendar

Answer: B,D,E

 

NEW QUESTION 27
Which cross docking methods require the use of SAP Advanced Planning and Optimization ? Note : There are 2 correct answers to this question.

  • A. EWM - triggered opportunistic cross docking
  • B. Recipient-driven flow-through
  • C. Picking from goods receipt
  • D. Push deployment

Answer: C,D

 

NEW QUESTION 28
What can a warehouse order include? There are 2 correct answers to this question.

  • A. Wave items
  • B. Physical inventory items
  • C. Warehouse tasks
  • D. Warehouse requests

Answer: B,C

 

NEW QUESTION 29
When working with semi-system-guided queues, after scanning the system checks which of the following? There are 3 correct answers to this question.

  • A. An open warehouse task exists for this HU
  • B. The reported resource is allowed to process the HU
  • C. The scanned HU is available in the specified storage bin
  • D. The HU field is empty

Answer: A,B,C

 

NEW QUESTION 30
When you generate an EWM inbound delivery manually without a template, meaning without an expected goods receipt. In this case you must make sure that the data in the inbound delivery is validated. From where you can use the standard implementation of Business Add-In (BAdI)? Please choose the correct answer.

  • A. SCWM/FX_EWM_PROD
  • B. SCEP/EX_ERP_PROD
  • C. SCWM/EX_EWM_PROD
  • D. SCWM/EX_ERP_PROD

Answer: D

 

NEW QUESTION 31
An Inspection lot summery can be done for which of the following? There are 2 correct answers to this question.

  • A. Product/Batch/Vendor
  • B. Product/Batch
  • C. Product/Batch/Reference Document

Answer: B,C

 

NEW QUESTION 32
......


SAP Extended Warehouse Management with SAP S/4HANA Certification Exam Details:

Passing ScoreC_S4EWM_1909 - 64%
Schedule ExamSAP Training
LevelAssociate
Exam CodeC_S4EWM_1909
Sample QuestionsSAP Extended Warehouse Management with SAP S/4HANA Certification Sample Questions
Duration180 mins
Exam NameSAP Certified Application Associate - Extended Warehouse Management with SAP S/4HANA
Reference BooksEWM100, EWM110, EWM120, EWM125, EWM130, EWM140

 

Validate your C-S4EWM-1909 Exam Preparation with C-S4EWM-1909 Practice Test: https://braindumps2go.dumpstorrent.com/C-S4EWM-1909-exam-prep.html