NEW QUESTION # 128
Which of the following contributes to the value of the commissioning process?
- A. Ensuring that the project budgetary goal is met
- B. Verifying that the building water fixtures are installed properly
- C. Verifying that the building systems perform as intended
- D. Ensuring that the project is delivered to meet the permitting requirements
Answer: C
Explanation:
Explanation
The commissioning process is a quality assurance process that ensures that the building systems perform as intended, based on the owner's project requirements and the design team's basis of design. The commissioning process can provide value to the project by improving energy efficiency, reducing operation and maintenance costs, enhancing occupant comfort and satisfaction, and reducing risks and liabilities123. References: LEED BD+C Reference Guide, Energy and Atmosphere, page 631; LEED BD+C Reference Guide, Enhanced Commissioning, page 661; LEED Building Commissioning: Why You Should Get Accredited
NEW QUESTION # 129
What are the three phases within the Integrative Process Credit, Integrative Process?
- A. Schematic Design, Design and Construction, Operations and Feedback
- B. Design Charrette, Schematic Design, Operations and Feedback
- C. Pre-design, Discovery, Design and Construction
- D. Discovery, Design and Construction, Operations and Feedback
Answer: D
Explanation:
Explanation
The Integrative Process credit under the LEED BD+C v4 rating system encourages the coordination of all the project team members, starting from the predesign phase, to discover unique opportunities for project design, enhanced building performance, and green features. The three phases within the Integrative Process Credit are:
* Discovery phase: This involves investigating at least two energy-related and several water-related sustainable design strategies prior to the end of schematic design1.
* Design and Construction (implementation) phase: This requires the project teams to turn their findings into reality2.
* Occupance, Operations, and Performance Feedback phase: This phase involves the evaluation of the implemented strategies and their effectiveness3.
References:
* LEED Integrative Process Credit Explained - Projectific, Inc.
* LEED AP BD+C v4 - Integrative Process Flashcards | Quizlet
* Achieving the LEED v4 Integrative Process Credit - SketchUp
NEW QUESTION # 130
In the energy modeling of a building envelope, which of the following U-values should be considered as an assembly U-value?
- A. Concrete
- B. Steel
- C. Glass
- D. Wall
Answer: D
Explanation:
Explanation
The assembly U-value of a building envelope component is the overall rate of heat transfer through that component, taking into account the different materials and layers that make up the component. For example, the assembly U-value of a wall would include the effects of the insulation, framing, sheathing, cladding, air films, etc. The assembly U-value is different from the material U-value, which is the rate of heat transfer through a single material. For example, the material U-value of steel is much higher than the material U-value of glass, but the assembly U-value of a steel-framed window may be lower than the assembly U-value of a glass curtain wall, depending on the other factors involved.
References: = [LEED v4: Building Design + Construction Guide], Minimum Energy Performance Calculator - ASHRAE 90.1 - 2010, A Quick and Easy Guide to U-Values - First In Architecture.
NEW QUESTION # 131
A newly constructed school has installed solar thermal systems and wind turbines on site. To achieve the maximum number of Energy and Atmosphere points, which team members must be included?
- A. Construction Manager and Energy Modeler
- B. Commissioning (Cx) Agent and Facilities Manager
- C. Energy Modeler and Contractor
- D. Energy Modeler and Commissioning (Cx) Agent
Answer: D
Explanation:
Explanation
To achieve the maximum number of Energy and Atmosphere points, the project team must include an energy modeler and a commissioning agent.The energy modeler is responsible for performing the whole-building energy simulation that demonstrates the energy performance improvement over the baseline building, which is required for Energy and Atmosphere Prerequisite 2 and Credit 11.The commissioning agent is responsible for verifying that the building's energy systems are installed, calibrated, and perform according to the owner's project requirements, basis of design, and construction documents, which is required for Energy and Atmosphere Prerequisite 1 and Credit 31.The commissioning agent also ensures that the renewable energy systems are properly integrated and functioning2. The contractor and the construction manager are not directly involved in the energy modeling or commissioning process, although they must follow the design specifications and coordinate with the commissioning agent. The facilities manager is not required for achieving the Energy and Atmosphere points, although they may benefit from the training and documentation provided by the commissioning agent.References:
* LEED v4 for Building Design and Construction, p.361
* Understanding Integrative Design in LEED v4, p.92
NEW QUESTION # 132
A tenant of a new office building will require 100 workstations per floor. Each floor will have two bathroom facilities and one conference room. How many lighting control devices with at least three lighting levels per floor are required to comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control?
- A. 100 lighting control devices
- B. 91 lighting control devices
- C. 93 lighting control devices
- D. 103 lighting control devices
Answer: C
Explanation:
Explanation
To comply with Indoor Environmental Quality Credit, Interior Lighting, Option 1. Lighting Control, the tenant of a new office building will require93 lighting control deviceswith at least three lighting levels per floor.This is because the credit requires that at least 90% of individual occupant spaces have lighting controls that enable occupants to adjust the lighting to suit their individual tasks and preferences1.The credit also requires that all shared multioccupant spaces have lighting controls that enable adjustments that meet the needs of the group1.According to the LEED BD+C Reference Guide, an individual occupant space is defined as an enclosed space or an open space that is occupied by one person and is at least 50 square feet (4.6 square meters) in area1.A shared multioccupant space is defined as an enclosed or open space that is occupied by more than one person and is at least 100 square feet (9.3 square meters) in area1.
Based on the given information, each workstation can be considered as an individual occupant space, and each bathroom facility and conference room can be considered as a shared multioccupant space. Therefore, the number of lighting control devices per floor can be calculated as follows:
* For the 100 workstations, 90% of them need lighting controls, which is 90 workstations. Each workstation needs one lighting control device, so the total number of lighting control devices for the workstations is 90.
* For the two bathroom facilities, each facility needs one lighting control device, so the total number of lighting control devices for the bathroom facilities is 2.
* For the one conference room, one lighting control device is needed, so the total number of lighting control devices for the conference room is 1.
The total number of lighting control devices per floor is then 90 + 2 + 1 =93.
References:Interior lighting
NEW QUESTION # 133
Where must a building's no-smoking signage be posted?
- A. Within 25 ft. (8 m) of all building entrances
- B. Within 10 ft. (3 m) of all building entrances
- C. Within 25 ft. (8 m) of the main building entrance(s)
- D. Within 10 ft. (3 m) of the main building entrance(s)
Answer: A
Explanation:
Explanation
This is the requirement for the Indoor Environmental Quality prerequisite Environmental Tobacco Smoke Control, which applies to all LEED BD+C rating systems. The intent is to prevent or minimize exposure of building occupants, indoor surfaces, and ventilation air distribution systems to environmental tobacco smoke.
The no-smoking signage must explicitly state the 25 ft. (8 m) limitand communicate the no-smoking policy to occupants.
References: = [LEED v4: Building Design + Construction Guide], Indoor Environment Prerequisite: No Smoking within 25 Feet of Building, Non-smoking policy + signage. Message has links.
NEW QUESTION # 134
In addition to Materials and Resources Credit, Building Life-Cycle Impact Reduction, Option 3. Building and Materials Reuse, salvaged materials contribute to the achievement of
- A. Materials and Resources Credit, Building Product Disclosure and Optimization - Environmental Product Declarations
- B. Materials and Resources Credit, Construction and Demolition Waste Management
- C. Materials and Resources Prerequisite, Storage and Collection of Recyclables
- D. Materials and Resources Credit, Building Product Disclosure and Optimization - Material Ingredients
Answer: B
Explanation:
Explanation
Materials and Resources Credit, Construction and Demolition Waste Management Salvaged materials are materials that have been recovered or diverted from the waste stream for reuse. They can contribute to the achievement of the Construction and Demolition Waste Management credit, which aims to reduce the amount of waste generated by construction and demolition activities and divert it from landfills and incinerators. By reusing salvaged materials, projects can reduce the demand for new materials, conserve natural resources, save energy, and lower greenhouse gas emissions.Salvaged materials can be counted as part of the total waste diverted from disposal, as long as they are not counted for the Building Life-Cycle Impact Reduction credit1.
References:
* Reference Guide for Building Design and Construction v4 - Pages 263-2642
* LEED Certification and Sustainable Construction Waste Management3
NEW QUESTION # 135
During a design charrette, community neighbors raise a concern about potential glare resulting from a project's highlyreflective roof. Which option should the LEED AP recommend to best address these concerns?
- A. Install a vegetative roofing system
- B. Change the roofing material to a dark material to eliminate the issue
- C. Increase the parapet height
- D. Change the design to reduce the amount of roofing area
Answer: A
Explanation:
Explanation
Installing a vegetative roofing system is the best option to address the potential glare resulting from a project's highly reflective roof. A vegetative roofing system, also known as a green roof, is a roof that is partially or completely covered with vegetation and a growing medium, planted over a waterproofing membrane. A vegetative roofing system can reduce the reflectivity of the roof surface and mitigate the glare impact on the surrounding environment. It can also provide other benefits, such as reducing heat island effects, improving stormwater management, enhancing biodiversity, and increasing roof insulation. Therefore, option A is the correct answer. The other options are not as effective or desirable as installing a vegetative roofing system.
Changing the design to reduce the amount of roofing area (option B) may not be feasible or desirable, as it may compromise the project's program or performance. Changing the roofing material to a dark material to eliminate the issue (option C) may reduce the glare, but it will also increasethe heat absorption and emission of the roof, contributing to heat island effects and increasing cooling loads. Increasing the parapet height (option D) may block some of the glare, but it will also increase the material and construction costs, and it may not be sufficient to prevent glare from all angles.For more information on vegetative roofing systems and their benefits, you can refer to the LEED v4 Reference Guide for Building Design and Construction1or the Green Roofs for Healthy Cities website2.
NEW QUESTION # 136
Which of the following variables must be included in the calculations for Indoor Environmental Quality Credit. Quality Views?
- A. Building furniture
- B. Permanent interior obstructions
- C. Ceiling heights
- D. Movable partitions
Answer: B
Explanation:
Explanation
According to the LEED v4 Reference Guide for Building Design and Construction, the calculations for Quality Views must include the following variables: window size and configuration, glazing factor, window head height, distance of the window from the floor, permanent interior obstructions, and exterior obstructions.
Ceiling heights, building furniture, and movable partitions are not required to be included in the calculations.
References:
* LEED v4 Reference Guide for Building Design and Construction, Indoor Environmental Quality Credit:
Quality Views, page 7061
* Daylight and Quality Views
NEW QUESTION # 137
Which of the following innovation proposals is most likely to be successful to achieve an Innovation Credit?
- A. Being located next to a 20 mi. (32 km) award-winning bicycle trail
- B. Distributing leaflets to project occupants about available public transit services nearby
- C. Providing an educational program on the environmental and human health benefits of green building practices
- D. Including locked, indoor bicycle storage for 100% of project occupants
Answer: C
Explanation:
Explanation
Providing an educational program on the environmental and human health benefits of green building practices is a potential innovation strategy that is not addressed by any existing LEED credit. It also meets the criteria of being measurable, replicable, and having a positive impact on the project and the environment.References:
LEED v4 BD+C Reference Guide, Innovation Category, INc1: Innovation, Option 1. Innovation (1 point), page 704.
NEW QUESTION # 138
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as which of the following?
- A. Group project
- B. Batch project
- C. Master Site project
- D. Neighborhood project
Answer: A
Explanation:
Explanation
LEED project boundaries that include multiple similar buildings which are all eligible for certification can be registered as a group project. A group project allows multiple buildings (or interior spaces within multiple buildings) on a shared site to be certified as a single LEED project. These projects must meet the criteria outlined in the LEED Campus Guidance for Projects on a Shared Site, such as having the same construction contract, ownership, management, space type, rating system, and compliance paths. A group project will receive one certification and rating for the entire group.References: Group Projects (previously Multiple Building Projects), CAGBC News, September 1, 2020.
NEW QUESTION # 139
Innovation credits for exemplary performance can be awarded for
- A. demonstrating significant environmental benefits
- B. achieving one pilot credit
- C. achieving double the credit requirements
- D. demonstrating a qualitative improvement in environmental performance
Answer: C
Explanation:
Explanation
Exemplary performance credits are one of the options to earn innovation points under the LEED v4.1 rating system. They are typically awarded for achieving double the credit requirements or the next incremental percentage threshold of an existing LEED v4.1 prerequisite or credit that allows exemplary performance. For example, to earn an exemplary performance point for the Energy and Atmosphere credit Optimize Energy Performance, the project must demonstrate a percentage improvement in the proposed building performance rating compared to the baseline building performance rating per ASHRAE 90.1-2010 by at least 12 percentage points for new construction, or by at least 16 percentage points for major renovations.
References: = NC-v4.1 INc1: Innovation | LEEDuser, Guide to Exemplary Performance Credits in LEED-NC v4 | LEEDuser
NEW QUESTION # 140
Which would contribute to compliance with Sustainable Sites Credit, Open Space?
- A. An intensive vegetated roof, provided the building has at least a 1.0 Floor to Area Ratio (FAR)
- B. A parking lot that serves as the location for a monthly flea market
- C. A forested area containing nature trails, that also achieves Sustainable Sites Credit, Site Development - Protect or Restore Habitat
- D. A mall with an indoor atrium, featuring a reflective roof
Answer: C
Explanation:
Explanation
According to the LEED v4: Building Design + Construction Guide, the Sustainable Sites Credit, Open Space requires the project to provide outdoor space greater than or equal to 30% of the total site area (including building footprint). At least 25% of that outdoor space must be vegetated, have overhead vegetated canopy, or be a water body. Option A does not qualify as outdoor space, Option B is not vegetated or a water body, and Option C only applies to projects with a FAR of less than 1.0. Option D meets the requirements for both outdoor space and vegetation, and also contributes to the protection or restoration of habitat1. References:
LEED v4: Building Design + Construction Guide, Sustainable Sites Credit, Open Space, Requirements1
NEW QUESTION # 141
What is the basis of energy consumption in determining the percentage of green power or carbon offsets?
- A. Efficiency
- B. Quantity
- C. Quality
- D. Performance
Answer: B
Explanation:
Explanation
The basis of energy consumption in determining the percentage of green power or carbon offsets is the quantity of energy used by the project, measured in kilowatt-hours (kWh) or British thermal units (Btu). Green power is electricity generated from renewable sources, such as solar, wind, hydro, biomass, or geothermal.
Carbon offsets are reductions or removals of greenhouse gas emissions from a project or activity that compensates for theemissions from another source. According to the LEED Reference Guide for Building Design and Construction1, the Energy and Atmosphere Credit, Green Power and Carbon Offsets, requires the project to engage in a contract for qualified resources that meet the following requirements:
* The contract term is at least five years.
* The green power or carbon offsets are based on the quantity of energy consumed by the building.
* The green power is Green-e Energy certified or the equivalent.
* The carbon offsets are Green-e Climate certified, Verified Carbon Standard certified, Gold Standard certified, or the equivalent.
References:
* LEED Reference Guide for Building Design and Construction v4
* Green Power and Carbon Offsets | U.S. Green Building Council
* Green Power and Carbon Offsets - LEEDuser
* Green Power and Carbon Offsets - LEED v4 for BD+C: New Construction ...
NEW QUESTION # 142
A project has a potable water source as well as two alternative water sources. Which of the following statements is applicable for a project using two alternative water sources?
- A. Match uses by location: indoor sources to indoor uses, outdoor sources to outdoor uses
- B. All alternative water sources should be treated to potable water standards
- C. A project may not use two alternative water sources
- D. Target the uses that require the least treatment first
Answer: D
Explanation:
Explanation
The best practice for using alternative water sources is to target the uses that require the least treatment first, such as irrigation, toilet flushing, and cooling tower makeup. This reduces the energy and cost associated with treating water to higher standards than necessary. Matching uses by location is not a requirement, nor is treating all alternative water sources to potable water standards. A project may use more than one alternative water source as long as they meet the applicable codes and standards. References: WE Credit Indoor Water Use Reduction, WE Credit Outdoor Water Use Reduction, WE Credit Cooling Tower Water Use1
NEW QUESTION # 143
Which of the following project team members should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning?
- A. Occupants
- B. Contractor
- C. Owner
- D. Facility manager
Answer: B
Explanation:
Explanation
Contractor
The contractor is the project team member who should be integrated early into the design phase to assist with earning the Materials and Resources Prerequisite, Construction and Demolition Waste Management Planning.
The contractor is responsible for implementing the waste management plan, which includes estimating the types and quantities of waste materials, identifying the diversion strategies, selecting the waste haulers and recyclers, tracking and documenting the waste diversion performance, and training the subcontractors and workers. The contractor can provide valuable input on how to reduce, reuse, and recycle the construction and demolition waste, as well as identify potential challenges and opportunities for achieving the prerequisite requirements.
References:
Reference Guide for Building Design and Construction v4 - Pages 263-2641 LEED Certification and Sustainable Construction Waste Management1
NEW QUESTION # 144
Which of the following project types is required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations?
- A. Schools
- B. Retail
- C. Healthcare
- D. Core and Shell
Answer: C
Explanation:
Explanation
Healthcare projects are required to consider the perimeter floor area instead of the regularly occupied floor area under the Indoor Environmental Quality Credit, Daylight calculations. This is because healthcare projects have different daylighting needs and challenges than other project types, and the perimeter area is more likely to have access to natural light and views. The perimeter floor area is defined as the regularly occupied spaces within 15 feet (4.5 meters) of the exterior wall that meets the minimum glazing requirements. References:
LEED v4 for Building Design and Construction, p. 6021
LEED v4 for Building Design and Construction, p. 362
NEW QUESTION # 145
For a task chair purchased for a healthcare facility, which portion of the product contributes toward Materials and Resources Credit, Furniture and Medical Furnishings?
- A. Plastic armrests, 30% of product by weight, with added antimicrobial treatment
- B. Fabric, 5% of product by weight, with stain resistant treatment containing Perfluorinated Compounds (PFCs)
- C. Wheels, 4% of product by weight, that do not contain lead, mercury, cadmium or antimony
- D. Metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium
Answer: D
Explanation:
Explanation
The metal base, 20% of product by weight, which do not contain heavy metals and is not plated with hexavalent chromium, contributes toward Materials and Resources Credit, Furniture and Medical Furnishings.
This is because it meets the criteria of Option 1: Minimal Chemical Content, which requires that all components that constitute at least 5%, by weight, of a furniture or medical furnishing assembly must contain less than 100 ppm of at least four of the five chemical groups listed in the option. The other portions of the product either do not meet the 5% weight threshold (wheels), or contain chemicals that are restricted by Option 1 (fabric, armrests).References: LEED v4 BD+C Reference Guide, Materials and Resources Category, MRc Furniture and Medical Furnishings, Option 1. Minimal Chemical Content, page 711.
NEW QUESTION # 146
......